At 360 SynergyTech, we design, move and run applications on the cloud. That means migration in stages rather than one weekend, microservices and serverless where they cut cost, identity and encryption set up properly, and the DevOps pipelines that deploy to it, mostly on AWS with Docker. Our team is based in Lahore, Pakistan, working Monday to Friday, 9am to 10pm PKT, which covers the full working day across the UK, Europe and the Gulf and the morning in the United States.
34%
Reduction in infrastructure costs
4X
Faster deployment cycles
99.9%
Uptime reliability
Seamlessly transition your on-premises infrastructure to the cloud. We handle data migration, application re-platforming, and testing to ensure minimal downtime and maximum efficiency.
Design and deploy microservices-based applications for enhanced flexibility and scalability. Our solutions enable independent deployment and maintenance of individual services.
Leverage serverless architectures to reduce operational overhead. We build event-driven applications that scale automatically, optimizing costs and performance.
Ensure your cloud environment is secure and compliant with industry standards. We implement encryption, identity management, and regular audits to protect your data.
Optimize your cloud usage with multi-cloud strategies. We integrate multiple cloud providers to enhance resilience, reduce vendor lock-in, and improve service availability.
Cloud engineering is designing, moving and running your applications on cloud infrastructure so they scale with demand and cost what they should. 360 SynergyTech delivers on Microsoft Azure and Amazon Web Services, handling cloud migration, microservices and serverless architecture, security and compliance work, multi-cloud strategy, and the DevOps pipelines that deploy to it.
Cloud work splits into two jobs that get confused with each other: moving what you have, and changing it so the move pays off. Lifting an application across unchanged gets you a bill in a new place; resizing it, letting it scale with demand and moving the bursty parts to serverless is what makes the bill smaller than the servers it replaced. The pipelines and the day-to-day running of what lands there are software engineering work, and a warehouse or pipeline that moves with it belongs to data engineering.
A migration is staged for the same reason: the least risky workload goes first to prove the pipeline, the costs and the rollback, and the old environment stays available until each piece has run in production. Identity and access, encryption in transit and at rest, and monitoring are designed in at that point rather than added once something has already gone wrong.
Two, properly, rather than a long list we half know. Which one a workload belongs on is usually decided by what it already depends on, not by preference.
A migration is a sequence, not an event. Each stage has to finish before the next one starts, and the old environment stays available until the new one has carried real traffic.
A short call about what you are trying to change, what you already run, and what success would look like. No charge, and no obligation to go further.
We write down what the first phase covers and what it does not, and send a detailed estimate within 2-3 working days of that call.
Work is delivered in slices you can see and comment on, with your own data in it, rather than a single delivery at the end. You review each one.
Handover includes the documentation and access you need to run it yourself, and we stay available for the fixes and changes that come out of real use.
